Wind park consists of 16 wind turbines with a total power of 32 MW. The contract included coordination of works related to building of the entire wind park between the Investor and the other contractors.
Among other things, the contract contained:
1. Building two 110 kV line fields connected to a 110 kV line between, one 110 kV coupling field. Rebuild of the span above 110 kV line along with construction of two new 110 kV pylons. Execution of communications designs with PGE Dystrybucja SA and PSE-Operator SA as well as supply of communications devices and start-up of the system.
2. Construction and agreement with PGE Dystrybucja SA the designs of Green Energy measurement systems located in 16 wind turbines together with supply, installation and start-up of the whole measuring system.
3. Execution and agreement with PGE Dystrybucja SA the designs for measurement systems for billing and for the station’s auxiliary systems. It also contains the supply, assembly and start-up of the systems.
4. Execution and agreement of the Operation and Station Maintenance Manual and Station’s Movement Cooperation for Service Dispatcher Manual.
5. Executing final tests of the Wind Farm and the power quality tests.
6. Supporting works of the Investor in cooperation and agreements with PGE and PSE and companies, which are providing telecommunications services, in technical and law aspects.