Telemechanics system on the HV/MV RPZ “Suwałki” station
The scope of work included:
1. Dismantling the existing UT J-64/MSP-2 telemechanics system at the HV/MV RPZ “Suwałki” station.
2. On-site installation, configuration and start-up of a complete telemechanics system according to the specification sheet.
3. Supplying the client with the telemechanics address lists within the 14 days prior to communication start- up.
4. Testing the communication with the BTC PRINS supervision system as well as in the engineering supervision channel.


